Guide

What Size Wire Do You Need? Ampacity, Voltage Drop and AWG

Size a circuit twice and keep the bigger wire. First find the smallest conductor whose ampacity covers the load; then check how much voltage that conductor loses over the length of the run. On short runs ampacity decides. On long runs voltage drop usually does — a 30 A, 240 V copper circuit 100 feet long passes on ampacity with 10 AWG but loses 3.11% of its voltage, and 8 AWG brings that down to 1.95%.


Two separate limits, and the larger answer wins

Ampacity is about heat: how much current the conductor can carry without exceeding its insulation's temperature rating. Voltage drop is about performance: how much of the supply voltage is lost in the wire before it reaches the load. The NEC ampacity tables ignore distance — an informational note says they do not take voltage drop into account — so a wire can pass on ampacity and still deliver low voltage at the end of a long run.

LimitWhat it protectsDoes run length matter?Status in the NEC
AmpacityThe conductor and its insulation, from overheatingNoMandatory — conductors must be sized for the load and protected by an overcurrent device
Voltage dropThe equipment at the end of the run, from operating on low voltageYes — drop rises in direct proportion to lengthGuidance in informational notes for ordinary branch circuits and feeders

The JoistCalc electrical calculator has one tab for each question: Wire & Breaker Size gives the ampacity minimum, and Voltage Drop tells you what a chosen gauge loses over your run. Use both, in that order, and keep whichever gauge is larger.

Why long runs need a bigger wire

The calculator's voltage-drop formula is VD = (K × multiplier × I × D) ÷ CM. K is the conductor's resistance constant (12.9 ohm·cmil/ft for copper, 21.2 for aluminum), the multiplier is 2 for single-phase because current travels out and back, I is the load current, D is the one-way length in feet, and CM is the conductor's cross-section in circular mils. Length sits on top of the fraction, so doubling the run doubles the drop: a 20 A load at 120 V on 12 AWG copper loses 3.29% over 50 ft and 6.58% over 100 ft. Circular mils sit underneath, so the only lever that works against distance is a larger conductor — or less current.

That is also why 240 V circuits tolerate distance better than 120 V ones. The same 1,800 W load draws 15 A at 120 V but 7.5 A at 240 V. Over 100 ft of 12 AWG copper, the 120 V version loses 5.93 V, or 4.94%; the 240 V version loses 2.96 V, or 1.23%. Half the current gives half the volts lost, and dividing by twice the voltage halves the percentage again.

Worked example: 30 A at 240 V over 100 feet, copper

Step 1 — ampacity. In the calculator's Wire & Breaker Size tab, enter Amps: 30 with Continuous load unchecked.

  1. Estimated ampacity needed = 30 A (no 125% factor, because the load is not continuous)
  2. Smallest 60°C copper conductor at or above 30 A = 10 AWG (30 A)
  3. Estimated breaker size = 30 A

Step 2 — voltage drop. Switch to the Voltage Drop tab and enter 10 AWG, Copper, Single-phase, 100 ft, 30 A, 240 V.

  1. Circular mils for 10 AWG = 10,380
  2. VD = (12.9 × 2 × 30 × 100) ÷ 10,380 = 7.46 V
  3. As a percentage = 7.46 ÷ 240 = 3.11%, leaving 232.54 V at the load

The calculator flags that result as exceeding the 3% guideline. Change only the gauge to 8 AWG and the drop falls to 4.69 V, or 1.95% (235.31 V at the load). Ampacity said 10 AWG; voltage drop says 8 AWG; the larger wire wins.

One refinement: these figures assume the load really draws the full 30 A. Voltage drop depends on the actual current, not the breaker size. If the appliance on that circuit draws 24 A, the same 100 ft of 10 AWG drops 5.97 V, or 2.49% — enter the real nameplate current when you have it.

Common circuits at 50, 100 and 150 feet

Every cell below was produced with the calculator's own constants. Inputs: copper, single-phase, load current equal to the breaker rating (a worst case), non-continuous load, one-way run length as shown. The second column is the Wire & Breaker Size result; each distance column gives the smallest gauge that keeps voltage drop at or below 3%, with the ampacity-minimum gauge's drop in parentheses where it fails.

CircuitAmpacity minimum (60°C Cu)50 ft100 ft150 ft
15 A at 120 V14 AWG12 AWG — 2.47% (14 AWG: 3.92%)8 AWG — 1.95% (14 AWG: 7.85%)8 AWG — 2.93% (14 AWG: 11.77%)
20 A at 120 V12 AWG10 AWG — 2.07% (12 AWG: 3.29%)8 AWG — 2.6% (12 AWG: 6.58%)6 AWG — 2.46% (12 AWG: 9.88%)
30 A at 240 V10 AWG10 AWG — 1.55%8 AWG — 1.95% (10 AWG: 3.11%)8 AWG — 2.93% (10 AWG: 4.66%)
40 A at 240 V8 AWG8 AWG — 1.3%8 AWG — 2.6%6 AWG — 2.46% (8 AWG: 3.91%)
50 A at 240 V6 AWG6 AWG — 1.02%6 AWG — 2.05%4 AWG — 1.93% (6 AWG: 3.07%)

At full rated current, the 120 V circuits pass 3% within 50 ft on their ampacity-minimum wire, while the 240 V rows hold out to roughly 100 ft (the 30 A row just misses there, at 3.11%). Real general-purpose circuits rarely draw their full breaker rating for long, so treat this table as the pessimistic end and run your own load through the calculator. Upsizing the wire does not change the breaker, and a much larger conductor may need terminals and devices rated to accept it.

What gauge wire for a 50 A subpanel?

Enter Amps: 50 in the Wire & Breaker Size tab and the calculator returns 6 AWG copper (55 A in the 60°C column) on a 50 A breaker. Then check the run in the Voltage Drop tab at 50 A, 240 V, single-phase: 6 AWG drops 2.05% (4.92 V) at 100 ft and 3.07% (7.37 V) at 150 ft, where 4 AWG brings it back to 1.93% (4.64 V). At 200 ft, 6 AWG drops 4.1% and 4 AWG 2.58%. Three cautions. A subpanel is fed by a feeder, and its branch circuits add their own drop on top, so the feeder should use less than the whole budget (see the next section). The 6 AWG answer comes from the 60°C column; where the wiring method and every termination are rated higher, the code can permit a different size — the electrician's call. And a feeder also needs a neutral and a grounding conductor, sized by rules this calculator does not cover.

The 3% and 5% figures are guidance, not a code requirement

The figures everyone quotes — no more than 3% drop on a branch circuit, and no more than 5% combined across the feeder and branch circuit to the farthest outlet — come from informational notes in the NEC's branch-circuit and feeder articles (210.19 and 215.4(A)(2) in the 2026 edition), with a cross-reference from the ampacity section. The NEC classes informational notes as explanatory material, not enforceable requirements, and the note numbers have moved between editions. Two qualifications: Article 647, for sensitive electronic equipment, does set mandatory voltage-drop limits, tighter than the notes; and your local authority decides which edition applies, may amend it, or may adopt another code with its own limit, so ask the inspector. "Not mandatory" is not "safe to ignore" — motors and heaters perform worse on low voltage, and 3% remains a sensible design target.

Copper vs. aluminum

Aluminum conducts less well than copper of the same size. In the calculator, its resistance constant is 21.2 against copper's 12.9 — about 1.64 times as much — so every voltage-drop figure is about 1.64 times larger for the same gauge. Rerunning the worked example in aluminum (30 A, 240 V, 100 ft, single-phase): 8 AWG drops 3.21% instead of copper's 1.95%, and 6 AWG aluminum drops 2.02%. The Wire & Breaker Size tab, however, is copper only. Aluminum has its own, lower ampacity column in the NEC tables and needs terminations listed for aluminum, so size its ampacity from the code table or with your electrician, then use the calculator to check its voltage drop.

What the calculator does not cover

Each of these can change the answer, almost always toward a larger wire. The calculator applies none of them, so this page publishes no numbers for them.

Where this goes wrong

Where these numbers come from

Every voltage-drop and wire-size figure on this page was computed with the JoistCalc electrical calculator's own constants. The sources below are the code those figures are checked against and the commentary behind the 3% and 5% guidance.

Estimates only, for planning purposes. Always verify against the current NEC, your local code amendments, and a licensed electrician before any installation.