Calculator 02 / Gravel & Aggregate

Gravel Calculator

Gravel is priced by weight but measured by volume, so the tonnage depends on the material's density as much as on the size of the hole. Estimate tons of gravel, crushed stone, sand, or topsoil for a driveway, base course, or fill area.


Density is approximate — actual weight varies with moisture and source material.

How this calculator works

Gravel and aggregate are sold by weight (tons), but you measure the job by volume. This tool converts your area and depth to cubic yards, then applies the material's density to get tons.

Volume (ft³) = Length (ft) × Width (ft) × (Depth (in) ÷ 12) Order volume = (Volume (ft³) × (1 + Waste %)) ÷ 27 cubic yards Weight (lb) = Volume (ft³) × Density (lb/ft³) × (1 + Waste %) Tons = Weight (lb) ÷ 2000

Worked example: a 20 × 12 ft driveway base

A 20 ft × 12 ft parking pad, 4 in of paver base at 105 lb/ft³, 10% waste:

  1. Area = 20 × 12 = 240 sq ft
  2. Depth = 4 ÷ 12 = 0.333 ft
  3. Volume = 240 × 0.333 = 80 cu ft
  4. Order volume = (80 × 1.10) ÷ 27 = 3.26 cubic yards
  5. Weight = 80 × 105 × 1.10 = 9,240 lb = 4.62 tons
  6. Weight without waste = 8,400 lb = 4.20 tons

Note that the yardage and the tonnage both carry the waste factor. They are two ways of describing the same order, and a supplier who quotes by the yard and one who quotes by the ton should be pricing the same pile.

What one cubic yard covers

A cubic yard is 27 cubic feet, so coverage is simply 324 divided by the depth in inches. This is the fastest sanity check on any quote — if the yardage does not roughly match your area at your depth, something is wrong.

DepthArea per cubic yardTypical use at this depth
1"324 sq ftTop dressing only
2"162 sq ftDecorative rock, light paths
3"108 sq ftWalkways, landscape beds
4"81 sq ftPatio base, light driveway
6"54 sq ftDriveway base, heavier traffic
12"27 sq ftTrench drains, poor subgrade

How deep to go

Depth is set by what the surface has to carry and by what is underneath it. Soft or clay subgrade needs more; compacted stable soil needs less.

ApplicationDepthNotes
Garden path / walkway2–3"Over landscape fabric
Paver or slab base4–6"Plus about 1" of bedding sand
Driveway, stable soil4–6"Compact in two lifts, not one
Driveway, soft or clay soil8–12"Consider geotextile beneath
French drain / trench12"+Washed stone, no fines

Which aggregate to ask for

Suppliers work in size numbers, not descriptions. Asking for "gravel" gets you whatever is nearest the loader. The distinction that matters most is whether the product contains fines: material with fines locks together and compacts, washed material stays loose and drains.

Ask forSizeCompacts?Use
Crusher run / #411¾" to dustYesBase under pavers, driveways
#57 stone¾"No — washedDrainage, driveway surface
#8 stone⅜"No — washedPaver bedding, fine drainage
#4 stone1–1½"NoHeavy base, erosion control
Pea gravel⅜" roundedNo — rounds rollDecorative only; never as base
Stone dust / screeningsFinesYesPaver setting bed

Density, and tons per cubic yard

The dropdown carries a density in pounds per cubic foot. Multiplied by 27 and halved by 2,000, that is the tons-per-yard figure a supplier will quote you. Moisture moves these numbers more than most people expect — a rained-on pile can weigh 10–15% more than the same volume dry, and you pay for the water.

MaterialDensityTons per cubic yard
Gravel / paver base105 lb/ft³1.42
Crushed stone100 lb/ft³1.35
Sand100 lb/ft³1.35
Decorative / river rock95 lb/ft³1.28
Topsoil76 lb/ft³1.03

Where aggregate orders go wrong

  • Compaction is not waste. Crusher run loses roughly a fifth of its loose volume when properly compacted. If you need 4 inches after compaction, order for about 5 inches loose. The waste factor covers spillage and over-dig, not compaction — add for it separately.
  • Mixing up yards and tons. They are not interchangeable and the ratio changes with the material. Quote both to your supplier and let them reconcile.
  • Using rounded stone as a base. Pea gravel and river rock never lock together. Under pavers they migrate, and the surface goes wavy within a season.
  • Measuring the finished grade. Depth means excavated depth. If you measure down from where the surface will end up, you are a full course short.
  • Ignoring delivery minimums. Most yards will not tip less than a full ton, and many charge the same for a partial load as a full one. Round up to the truck, not to the estimate.

Where these numbers come from

The size numbers on a quarry ticket come from a published gradation standard, not a local naming habit — which is why a #57 means the same thing in two different states.

How deep should a gravel driveway base be?

A common base course is 4–6 inches of compacted gravel; heavier vehicle traffic or soft subgrade may call for 8+ inches, often in two compacted lifts.

Why does the same volume weigh differently depending on material?

Density varies by rock type, particle size, and moisture content. Always confirm density with your supplier's spec sheet for the exact product you're ordering.

Should I order by the ton or by the cubic yard?

Whichever your supplier quotes in — this calculator gives you both, and both include the waste factor, so they describe the same order. Yards are the safer unit to argue in, because a yard is a fixed volume while a ton of wet material occupies less space than a ton of dry. If a quote is priced by weight, ask what density they are assuming.

Does the waste factor cover compaction?

No, and this catches people out. Waste covers spillage, over-dig and the material left in the truck. Compaction is separate: crusher run and other products with fines lose roughly 20–25% of their loose volume once rolled. If your target is a compacted depth, either add that on top of the waste factor or enter a loose depth about a quarter deeper than the finished one.

Why is the order volume larger than the plain volume?

Because it includes your waste factor, matching the tonnage above it. The plain volume line is the raw geometry of the excavation. The order volume is what to actually buy. An earlier version of this calculator omitted the waste factor from the yardage while including it in the tonnage, so the two disagreed — that is fixed.

Can I save, share, or print a calculation?

Yes — use the Save, Copy link, and Print buttons under your results. Saved calculations can be grouped into a named project on the My Projects page for a combined job estimate with cost totals. Everything is stored only in your browser, never uploaded — see the Privacy Policy for details.

Estimates only. Suppliers typically sell in fixed ton increments — confirm exact yardage and delivery minimums before ordering.